USACE Accident Prevention Plan (APP) - For Marine Based Projects
USACE Accident Prevention Plan (APP) - For Marine Based Projects
USACE Accident Prevention Plan (APP) - 2014 Version (E.M. 385-1-1)
Complete Plan Template with All Sections - 100% Approval Money-Back Guarantee
For Projects On or Near the Water. Spec Section 01 35 26
APP CONTENTS: Click here to see the government APP Checklist (fror Marine Projects) and plans that are included in this template.. Plans noted as "N/A" in the government APP checklist are typically very site-specific and most often, not required for many projects. These plans are not included in the APP Template but can be tailored to your project and purchased separately.
USACE Accident Prevention Plan (APP) - 2014 Version (Em-385-1-1)
Complete Plan Template with All Sections
100% Approval Money-Back Guarantee
MASTER TABLE OF CONTENTS
Acronyms and Abbreviations
Section 1 Signature Sheet
Section 2 Background Information
Section 3 Statement of Safety and Health Policy
Section 4 Project Organization
Section 5 Subcontractors and Suppliers
Section 6 Training
Section 7 Safety and Health Inspections
Section 8 Accident Reporting
Section 9 Required Plans
Section 10 Risk Management Processes
Appendix I Personnel Qualifications
Appendix II Material Safety Data Sheets
(APP, Version 2014: Approx. 263 page template [2014])
The USACE APP is the most voluminous of the required plans. The Master Table of contents for the 2008 and 2014 versions of the APP are identical however the content is substantially different.
As of June 2015 the 2014 version of USACE Safety Manual E.M. 385-1-1 has not been published in hardcopy but the electronic version is available online. Many USACE and NAVFAC Contracting Officers are now requiring the project Accident Prevention Plan (APP) to be prepared under the requirements of the 2014 version even if Contract issued Specification references the 2008 version of E.M. 385 . Some contracts however still require project plans to be prepared in accordance with the 2008 version of E.M. 385.
We recommend you confirm with your COR which version is applicable to your project. If you would like help determining this, please call us or email your specs to us. Jenn@PlanTheJob.com | (206) 734-4600.