Construction Plan Books and Consulting

USAF Plans Template

US AF EPP Template - Spec Section 01 57 19

US AF EPP Template - Spec Section 01 57 19

Sale Price:$397.00 Original Price:$485.00

USAF (United State Air Force) EPP - Modified | Spec Section 01 57 19

USAF Environmental Protection Plan - USAF EPP - Complete Plan

Please read Table of Contents. If in doubt, please contact us for clarification: Email: jenn [@] planthejob.com or phone: 1 (206) 734-3600.

The Complete Plan is approximately 63 Pages.
100% Approval Money-Back Guarantee

MASTER TABLE OF CONTENTS

Acronyms and Abbreviations

Specification Cross Reference Table

a. DESCRIPTION OF ENVIRONMENTAL PROTECTION PLAN

a.1 General Overview and Purpose

A. Descriptions

B. Duties and Authority

C. Procedures

D. Communications and Training

a.2 General Site Information

b. MANAGEMENT OF NATURAL RESOURCES

b.1 Land Resources

b.2 Tree Protection

b.3 Replacement of Damaged Landscape Features

b.4 Temporary Construction

c. HISTORICAL AND ARCHEOLOGICAL RESOURCES

c.1 Objectives

c.2 Methods

d. PROTECTION OF THE ENVIRONMENT FROM WASTE DERIVED FROM CONTRACTOR OPERATIONS

d.1 Control and Disposal of Solid and Sanitary Waste d-1

d.1.1 Control and Management of Solid Wastes

d.1.2 Construction and Demolition (C&D) Waste Management

d.1.3 Solid Waste Management Report

d.2 Control and Disposal of Hazardous Waste

d.2.a Waste Determination

d.2.b Sampling and Analysis Plan

d.2.c Methods of Hazardous Waste Accumulation/Storage

d.2.d Management Procedures for Storage, Labeling, Transportation, and Disposal of Waste

d.2.e Management Procedures and regulatory Documentation Ensuring Disposal of Hazardous Waste Complies with Land Disposal

d.2.f Recyclable Hazardous Materials

Universal Waste/e-Waste Management

Electronics End-of-Life Management

d.2.g Used Oil Management

d.2.h Pollution Prevention\Hazardous Waste Minimization Procedures

d.2.i Hazardous Waste Disposal Permitted Facilities

d.2.j Hazardous Waste Training

e. PREVENTION OF RELEASES TO THE ENVIRONMENT

Potential Spill Sources

e.1 Procedures to Prevent Releases to the Environment

Hazardous Materials Storage and Handling

Training Requirements

Methods and Procedures for Expeditious Contaminant Cleanup

e.2 Spill Notification Reporting

f. REGULATORY NOTIFICATION AND PERMITS

f.1 Permit Requirements

f.1.a Solid Waste Permits f-1

f.1.b Hazardous Waste Permits

f.1.c Notice of Intent / Termination

g. CLEAN AIR ACT COMPLIANCE

g.1 Federal, State and Local Permit Requirements

g.2 Pollution Generating Equipment

Stationary Equipment

Mobile Equipment

g.3 Refrigerants

Disposal of Equipment Dismantled On-site

g.4 Planned Air Pollution Generating Processes

Particulates

Compliant Materials


APPENDIX I – RESUMES AND QUALIFICATIONS

APPENDIX II - RECORD OF EMPLOYEE TRAINING

(USAF EPP:  ~81 Page Template)  

****************************************************************
The USAF EPP seems to be the plan that is most evolving.  Until recently, The USAF used one of the EMP formats but recently (2015) they have started using new EPP formats.  

If your Specs require a USAF EPP and the format does not resemble the format presented here, please contact us and we will prepare an EPP template that matches your specification exactly and provide it to you within 24-48 hours at the same price as the listed price for the EPP.

This offer is valid for any of the plans templates offered through www.PreConstructionPlans.com
 

 

 

sale
Buy Now